Close
(0) items
You have no items in your shopping cart.
All Categories
    Filters
    Preferences
    Search

    Hybrid Plug & Abandonment + Hydraulic Workover Unit

    $0.00
    With its modular designed and lighter load weight and footprint, Hybrid Plug & Abandonment Workover standalone unit mitigates the challenges that stem from limited space, excess well slot, pressure and remote, hard to reach locations.
    Ship to
    *
    *
    Shipping Method
    Name
    Estimated Delivery
    Price
    No shipping options

    KEY FEATURES:

     

    • Year Built : 2019
    • 500,000 lbs pulling capacity
    • Intervention depth deep to 9,000 feet
    • Self-contained for easy both land and sea transport
    • Through bore up to 32 inches
    • Handles 2-3/8” to 30” D. pipe, casing and conductor
    • 5,000 to 22,000 ft-lb range of torque capabilities
    • Self-racking, skidding, pipe laydown/ handling and Quick Jack features
    • BOP pneumatic trolley system capable of sustain up to 44,000 lbs
    • Quick pipe working with pneumatic Tong trolley system

     

     

    INNOVATION TECHNOLOGY

     

    • Hydraulic pipe laydown system for quick pipe stack, laydown and handling tubular with most safe pipe laydown area and fast.
    • Quick stack tower allows for a safer and easier way to enter and exit the work basket
    • Rig convertible to be Hydraulic Work Over (HWU) operation with less equipment
    • Faster Rig up and Rig down with stackable unit
    • Guidewire not required.
    Write your own review
    • Only registered users can write reviews
    *
    *
    • Bad
    • Excellent
    *
    *
    *

    KEY FEATURES:

     

    • Year Built : 2019
    • 500,000 lbs pulling capacity
    • Intervention depth deep to 9,000 feet
    • Self-contained for easy both land and sea transport
    • Through bore up to 32 inches
    • Handles 2-3/8” to 30” D. pipe, casing and conductor
    • 5,000 to 22,000 ft-lb range of torque capabilities
    • Self-racking, skidding, pipe laydown/ handling and Quick Jack features
    • BOP pneumatic trolley system capable of sustain up to 44,000 lbs
    • Quick pipe working with pneumatic Tong trolley system

     

     

    INNOVATION TECHNOLOGY

     

    • Hydraulic pipe laydown system for quick pipe stack, laydown and handling tubular with most safe pipe laydown area and fast.
    • Quick stack tower allows for a safer and easier way to enter and exit the work basket
    • Rig convertible to be Hydraulic Work Over (HWU) operation with less equipment
    • Faster Rig up and Rig down with stackable unit
    • Guidewire not required.